Got a question or comment?
Name:


Email:


Question/Comment:
954-608-3473
Call for Free Estimate

www.epoxyfloorsforless.com
Concrete Services:

Garage Floors Process Boca Raton

We Offer All Epoxy and Concrete Services in These Florida Cities
Services We Offer
Professional Applicators of:

  • Epoxy
  • Urethane
  • Stains
  • Sealers
  • Polyaspartic
  • Basement Floors
  • Factory Floors
  • Garage Floors
  • Commercial Floors
  • Residential Floors
  • Industrial Floors

and many other specialty flooring
Cities in Browad County 

• Coconut Creek
• Coral Springs
• Dania
• Davie
• Deerfield Beach
• Everglades Parkway
• Fort Lauderdale
• Hallandale
• Hollywood
• Lauderdale Lakes
• Lauderhill
• Pembroke Pines
• Plantation
• Pompano Beach
• Miramar
• Southwest Ranches
• Sunrise
• Tamarac 
• West Park


Cities in Palm Beach County


• Boca Raton
• Boyton Beach
• Delray Beach
• Greenacres
• Jupiter
• Lake Worth
• Royal Palm Beach
• Palm Beach Gardens
• Tequesta
• Wellington
• West Palm Beach

"Stellar Surfaces really delivered.  I had a vision of what I was hoping my epoxy kitchen floor would look like.  The owner, Steve, came out listened, provided his own insight and delivered a great product. I would highly recommend using this company"
STEP 1-GARAGE FLOOR SURFACE PREPARATION

At Stellar Surfaces the preparation of the garage floor is critical to ensure maximum adhesion of the epoxy. First, we grind your floor utilizing a walk behind diamond floor grinder that is attached to an industrial vacuum, which keeps dust and debris to a minimum.  The machine removes any unwanted stains or previously applied coatings resulting in a concrete floor that is clean and porous. This step ensures that the epoxy can properly adhere to the floor for a strong long lasting mechanical bond. 


Once the grinding is complete; we vacuum any remaining dust, and then fill all hairline cracks and divots using an industrial-grade epoxy patch. If any major cracks or spalling exits in the concrete the options to repair them can be discussed during the inspection part of the estimate. This part of the process can take up to several hours and is a critically important step!
STEP 2-PRIMER & BASE COAT APPLICATION

We use industrial quality epoxy that is low VOC and LEED compliant and manufactured in the United States from several leading polymer suppliers. This is industrial grade best-in-class product that does not come in cans from the local paint or home improvement stores. We mix the epoxy on site using a formula based on your garage size that has proven to provide maximum durability and build. The product is then poured onto the concrete floor and applied evenly using a squeegee, which forces the epoxy into the open pores of the concrete. The product is further distributed using a rolling and back rolling method for maximum adhesion and has self-leveling properties to ensure a uniform finish is achieved.

STEP 3- DECORATIVE CHIP DISTRIBUTION

The decorative polymer chips – chosen by you from our selection of designer color finishes are then broadcasted into the wet epoxy and chemically bond together which ultimately provides the look of Granite, Quartz, or Terrazzo. Our signature Granite & Quartz finishes include a 100% surface broadcast of chips, applied at a maximum rate of 25 pounds per 100 sqft. This provides a solid build to the floor and hides all cracks or imperfections. We have over 25 in-stock colors available to complement the color palette of the interior or exterior of your home or we can custom blend you a finish to your liking. Our Terrazzo finish includes a light broadcast of chips, and provides a durable clean looking garage floor. This finish is what most people normally think a painted or coated garage floor would look like but holds the same Stellar Surfaces guarantee and warranty against hot-tire pick up.

STEP 4- PROTECTIVE CLEAR COAT APPLICATION

The final step in the process is designed to seal the decorative chips into place, and provide an extremely durable protective clear coat that has an “orange peel” texture with anti-slip properties when complete.
We achieve this finish by reclaiming the excess chips, lightly scraping the floor, and then applying the protective clear coat using a proven mixing formula (based on square footage) along with an installation technique that has provided consistent results over the years. We use both UVR Epoxy and UVS Polyaspartic clear coats depending on your specific chemical resistant and UV protection needs.

STEP 5-DRYING TIMES & STELLAR BENEFITS

Our process can take up to a day or two to install, which allows for a quick return to service for your garage. Upon completion it will be extremely durable, chemical resistant, and easy to keep clean. Typically within 24 hours, your garage floor is open to light foot traffic and replacement of your contents. It is highly recommended that coating systems are completely cured prior to vehicular traffic, which can take up to 7 days depending on the type of protective clear coat applied and the environmental conditions. Once completed you will have a garage floor that “Looks and Last like Granite” extending the finish of your home into your garage.